USED20,780 mi.
2017 BMWM3 Base For Sale
in Westborough, MA$ 50,988
Dealer advertised price is the price given by the dealer. It may include rebates and incentives that you may not qualify for. It may also exclude charges such as fax, title, and license fees, and other fees. This price can change, and you should check with the dealer to see what is included or left out of the price shown.
What's next?
Know before you go.
Pre-qualify with no impact to your credit score to see your real monthly payment and terms before visiting the dealer.
Assumes $1,000 Down Payment
What's next?
Love the car, see the car.
Contact the dealer to see if the car is still available and schedule a test drive.
Key features of this 2017 BMW M3 Base in Westborough, MA
GPS Navigation
Bluetooth
Heated Seats
Condition
USED
Mileage
20,780
MPG
17 City / 26 Hwy
Body Style
Sedan
Exterior Color
Gray
Interior Color
Black
Transmission
Manual
Drive Train
RWD
Fuel Type
Gasoline
Engine
6 Cyl
Stock Number
AB5929
VIN
WBS8M9C52H5G84319
See more features
4-Wheel Disc Brakes
A/C
ABS
AM/FM Stereo
Adjustable Steering Wheel
Aluminum Wheels
Auto-Dimming Rearview Mirror
Automatic Headlights
Auxiliary Audio Input
Bluetooth
Bluetooth Connection
Brake Assist
Bucket Seats
CD Player
Child Safety Locks
Climate Control
Cruise Control
Daytime Running Lights
Driver Air Bag
Driver Illuminated Vanity Mirror
Driver Vanity Mirror
Floor Mats
Front Head Air Bag
Front Side Air Bag
GPS Navigation
Gasoline Fuel
HD Radio
HID headlights
Hard Disk Drive Media Storage
Headlights-Auto-Leveling
Heated Front Seat(s)
Heated Mirrors
Heated Seats
Immobilizer
Integrated Turn Signal Mirrors
Intermittent Wipers
Keyless Entry
Keyless Ignition
Keyless Start
Knee Air Bag
Leather Steering Wheel
Locking/Limited Slip Differential
MP3 Player
Mirror Memory
Multi-Zone A/C
Navigation System
Pass-Through Rear Seat
Passenger Air Bag
Passenger Air Bag Sensor
Passenger Illuminated Visor Mirror
Passenger Vanity Mirror
Power Door Locks
Power Driver Seat
Power Folding Mirrors
Power Mirror(s)
Power Passenger Seat
Power Steering
Power Windows
Premium Sound System
Rain Sensing Wipers
Rear A/C
Rear Air Conditioning
Rear Bench Seat
Rear Defrost
Rear Head Air Bag
Rear Spoiler
Rear Wheel Drive
Requires Subscription
Satellite Radio
Seat Memory
Security System
Smart Device Integration
Stability Control
Steering Wheel Audio Controls
Straight 6 Cylinder Engine
Telematics
Tire Pressure Monitor
Tires - Front Performance
Tires - Rear Performance
Traction Control
Trip Computer
Turbocharged
Universal Garage Door Opener
Variable Speed Intermittent Wipers
Buy your next car with confidence.
The CARFAX Report provides you with access to information like prior accidents and damage, number of owners, service records and mileage.
Assume $1,000 Down Payment
Pre-qualify with no impact to your credit score.
That’s right. And, once you’re pre-qualified, you’ll be able to see your real rate and monthly payment on each car while you search.