USED45,847 mi.
2017 BMWM2 Base For Sale
in Valley Stream, NY$ 33,990
Dealer advertised price is the price given by the dealer. It may include rebates and incentives that you may not qualify for. It may also exclude charges such as fax, title, and license fees, and other fees. This price can change, and you should check with the dealer to see what is included or left out of the price shown.
What's next?
Know before you go.
Pre-qualify with no impact to your credit score to see your real monthly payment and terms before visiting the dealer.
Assumes $1,000 Down Payment
What's next?
Love the car, see the car.
Contact the dealer to see if the car is still available and schedule a test drive.
Key features of this 2017 BMW M2 Base in Valley Stream, NY
GPS Navigation
Rear View Camera
Bluetooth
Heated Seats
Leather Seats
Condition
USED
Mileage
45,847
MPG
18 City / 26 Hwy
Body Style
Coupe
Exterior Color
Blue
Interior Color
Black
Transmission
Automatic
Drive Train
RWD
Fuel Type
Gasoline
Engine
6 Cyl
Stock Number
4258
VIN
WBS1H9C55HV786488
See more features
4-Wheel Disc Brakes
A/C
ABS
AM/FM Stereo
Adjustable Steering Wheel
Aluminum Wheels
Auto-Dimming Rearview Mirror
Automatic Headlights
Auxiliary Audio Input
Bluetooth
Bluetooth Connection
Brake Assist
Bucket Seats
CD Player
Climate Control
Cruise Control
Daytime Running Lights
Driver Adjustable Lumbar
Driver Air Bag
Driver Illuminated Vanity Mirror
Driver Vanity Mirror
Floor Mats
Front Head Air Bag
Front Side Air Bag
GPS Navigation
Gasoline Fuel
HD Radio
HID headlights
Hands-Free Liftgate
Hard Disk Drive Media Storage
Headlights-Auto-Leveling
Heated Front Seat(s)
Heated Mirrors
Heated Seats
Immobilizer
Integrated Turn Signal Mirrors
Intermittent Wipers
Keyless Entry
Keyless Ignition
Keyless Start
Knee Air Bag
Leather Seats
Leather Steering Wheel
Locking/Limited Slip Differential
MP3 Player
Mirror Memory
Multi-Zone A/C
Navigation System
Pass-Through Rear Seat
Passenger Adjustable Lumbar
Passenger Air Bag
Passenger Air Bag Sensor
Passenger Illuminated Visor Mirror
Passenger Vanity Mirror
Power Door Locks
Power Driver Seat
Power Folding Mirrors
Power Mirror(s)
Power Passenger Seat
Power Steering
Power Windows
Premium Sound System
Rain Sensing Wipers
Rear Air Conditioning
Rear Bench Seat
Rear Defrost
Rear Head Air Bag
Rear Spoiler
Rear View Camera
Rear Wheel Drive
Requires Subscription
Satellite Radio
Seat Memory
Security System
Smart Device Integration
Stability Control
Steering Wheel Audio Controls
Straight 6 Cylinder Engine
Telematics
Tire Pressure Monitor
Tires - Front Performance
Tires - Rear Performance
Traction Control
Trip Computer
Turbocharged
Universal Garage Door Opener
Variable Speed Intermittent Wipers
Buy your next car with confidence.
The CARFAX Report provides you with access to information like prior accidents and damage, number of owners, service records and mileage.
Open Today 9:00 AM - 8:00 PM