2023 BMW M3 Competition xDrive

Gasoline · Used ·    12,770 mi.
Key features
Leather Seats
Heated Seats
Bluetooth
Rear View Camera
GPS Navigation
Blind Spot Monitor
Vehicle details
MPG
16 city / 22 highway
Body style
Sedan
Exterior
Black
Drive train
AWD
Transmission
Automatic
Engine
6 Cyl
Interior
Black
Stock number
RW30203
VIN
WBS43AY03PFP19584
More details from United BMW

Priced below KBB Fair Purchase Price!Black Sapphire Metallic 2023 BMW M3 Competition AWD 8-Speed Automatic Steptronic 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hpThis M3 Competition is nicely equipped with Connected Package Pro, Driving Assistance Professional Package (Active Driving Assistant Pro and Extended Traffic Jam Assistant), Executive Package (BMW Head Up Display, Heated Steering Wheel, Power Tailgate, Remote Engine Start, and SensaTec Dashboard), Parking Assistance Package (Parking Assistant Plus), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW Curved Display, BMW TeleServices, Brake assist, Bumpers: body-color, Carbon Fiber Trim, Compass, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced USB & Bluetooth Plus Smartphone Integration, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Front Ventilated Seats, Fully automatic headlights, Garage door transmitter, harman/kardon Surround Sound System, harman/kardon Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, Icon Adaptive LED Headlights w/Laserlight, Illuminated entry, Knee airbag, Leather Shift Knob, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Black Calipers, M Shadowline Lights, M Sport Seats, Memory seat, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead airbag, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear reading lights, Rear window defroster, Remote keyless entry, Security system, SiriusXM Satellite Radio w/1 Year Subscription, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Wheels: 19x9.5 Fr. & 20x10.5 Rr M Black, and Wheels: 19x9.5 Fr.&20x10.5Rr. M Bi-color (1T8)... Odometer is 10249 miles below market average!WHY BUY FROM US United BMW is proud to be the #1 volume BMW dealer in the Nation as well as the largest retailer in Penske Automotive Group. BMW of North America has awarded United BMW with it's SIXTH consecutive Center of Excellence Award! United BMW is the only BMW dealership in Georgia to win this prestigious award! It is the customer's sole responsibility to verify the existence and condition of any equipment listed. United BMW of Roswell is not responsible for misprints on prices or equipment. It is the customer's sole responsibility to verify features and options.

Know before you go

Pre-qualify with no impact to your credit score to see your real monthly payment and terms before visiting the dealer.
Image of Vehicle
BMW M3 Competition xDrive
4/5 Consumer rating

Comfort

3.7

Performance

4.3

Styling

5.0

Value

4.3

Quality

4.0

Reliability

3.7

United BMW
4.7 Google
Open Today:

9:00 AM - 8:00 PM

Similar cars

2025 BMW M3 Competition

Used • 13,997 mi

$81,998

2025 BMW M3 Base

Used • 7,869 mi

$84,500

2024 BMW M3 Competition xDrive

Used • 12,459 mi

$86,987

2022 BMW M3 Competition xDrive

Used • 48,100 mi

$70,995

2027 BMW M3 Competition xDrive

New • 0 mi

$109,850

2027 BMW M3 Competition xDrive

New • 0 mi

$97,650

2027 BMW M3 Competition xDrive

New • 0 mi

$101,500

2027 BMW M3 Base

New • 10 mi

$97,399

2027 BMW M3 Base

New • 1 mi

$87,800